Memorial Park Middle School FWCS REPAIR Building Renovation
RENOVATIONS AT memorial park middle SCHOOL OCCURRED OVER A 3 YEAR PERIOD STARTING IN 2013, WITH THE MAJORITY OF THE WORK COMPLETED BY THE FALL OF 2015. WORK INCLUDED BOTH EXTERIOR AND INTERIOR IMPROVEMENTS TO THE ORIGINAL FACILITY, WHICH OPENED IN 1966.
NON-COMPLIANT STAIR RAILINGS WERE REPLACED WITH NEW RAILINGS IN ADHERENCE TO AMERICANS WITH DISABILITIES ACT STANDARDS.
security and student safety are also major components of the repair fwcs program. secure vestibules which ensure that all visitors must go through the office area before being admitted to the rest of the building were added at all buildings receiving major renovations.
The cafeteria area was updated with new flooring, ceilings, lighting and HVAC systems. with some of the savings from the original project, an expansion to the kitchen and cafeteria is scheduled for completion during the summer of 2016. this will provide for a full cooking kitchen on-site, bringing it in line with district standards for middle schools.
the gymnasium received new ceilings, led lighting, and a fresh coat of paint.
THE MEDIA CENTER FEATURES NEW LIGHTING, A LARGE CIRCULATION DESK, NEW FINISHES, AND MORE ROOM FOR STUDY AND COLLABORATION.
For more information on the REPAIR FWCS program, please visit us at