Snider High School REPAIR FWCS Building Renovation
Renovations at Snider High School occurred over a 3 year period starting in 2013, with the majority of the work completed by the Fall of 2015. Work included both exterior and interior improvements to the original facility, which opened in 1965.
In addition to the replacement of these deteriorated infrastructure systems with new, energy efficient systems, the building also received a facelift with existing flooring, ceilings and other finishes being replaced.
Art Labs, Family and Consumer Sciences, and Graphic Design Labs were renovated and given a clean, modern upgrade focusing on function and technology upgrades.
The gymnasium was out of date, with sub-standard lighting, worn floors and bleachers requiring frequent repairs.
New wood athletic flooring, bleachers, equipment, an open ceiling concept with energy efficient LED lighting and upgraded PA systems have transformed the gymnasium into a source of pride for students, athletes and fans alike.
The Media Center features new lighting, a large circulation desk, new finishes, and more room for study and collaboration.
For more information on the REPAIR FWCS program, please visit us at